---
product_id: 255998277
title: "Long Lead Acid Agm Battery (7 Ah/12 Volt)"
brand: "long"
price: "€ 55.35"
currency: EUR
in_stock: true
reviews_count: 5
category: "Long"
url: https://www.desertcart.gr/products/255998277-long-lead-acid-agm-battery-7-ah-12-volt
store_origin: GR
region: Greece
---

# 12 Volt power output 7 Ah high capacity AGM sealed durability Long Lead Acid Agm Battery (7 Ah/12 Volt)

**Brand:** long
**Price:** € 55.35
**Availability:** ✅ In Stock

## Summary

> 🔋 Power up your peace of mind with LongPower’s unstoppable energy!

## Quick Answers

- **What is this?** Long Lead Acid Agm Battery (7 Ah/12 Volt) by long
- **How much does it cost?** € 55.35 with free shipping
- **Is it available?** Yes, in stock and ready to ship
- **Where can I buy it?** [www.desertcart.gr](https://www.desertcart.gr/products/255998277-long-lead-acid-agm-battery-7-ah-12-volt)

## Best For

- long enthusiasts

## Why This Product

- Trusted long brand quality
- Free international shipping included
- Worldwide delivery with tracking
- 15-day hassle-free returns

## Key Features

- • **Compact & Lightweight:** Space-saving design at just 0.15 kg, perfect for professional setups without bulk.
- • **Reliable 7 Ah Capacity:** Power through your devices with a robust 7 Amp Hour battery life.
- • **Consistent 12 Volt Output:** Stable voltage ensures seamless compatibility with UPS, solar, and security systems.
- • **Extended 3-5 Year Floating Life:** Built to last with a superior floating time that keeps you powered longer.
- • **Maintenance-Free AGM Technology:** Spill-proof, sealed design for hassle-free, long-lasting performance.

## Overview

The Long Lead Acid AGM Battery (7 Ah/12 Volt) by LongPower delivers reliable, maintenance-free power with advanced AGM technology. Designed for UPS, solar, and security applications, it offers a compact, lightweight build and an impressive 3-5 year floating life, ensuring consistent performance and long-term durability for professional-grade energy needs.

## Description

Long Battery Lead Acid replacement batteries meet and even exceed the strictest device's manufacturers specification needs, to ensure its high standard quality, meaning taking care from all row material and components to the final product, tested automatically one by one. This is compatible with ups, safety security, solar etc. It has a long lasting work life 3-5 years floating time range.

Review: جودة ممتازة - بطارية ممتازة لم اواجه مشاكل وتعمل بكفائه
Review: مش حالك - مش حالك

## Features

- Comes from the brand Long
- Power: 7 Ah/12 Volt
- Compact construction

## Technical Specifications

| Specification | Value |
|---------------|-------|
| ASIN | B07N6NNJS1 |
| Antenna Location | Construction |
| Battery Capacity | 7 Amp Hours |
| Battery Cell Type | Lead-Acid, AGM |
| Battery capacity | 7 Amp Hours |
| Battery cell composition | Lead-Acid, AGM |
| Best Sellers Rank | #9,162 in Automotive ( See Top 100 in Automotive ) #11 in Automotive Replacement Batteries |
| Brand | LONG |
| Customer Reviews | 4.2 out of 5 stars 21 Reviews |
| Item Weight | 0.15 Kilograms |
| Manufacturer | LONG |
| Model Number | WP7-12(28W) |
| Number of Batteries | 1 12V batteries required. (included) |
| Number of batteries | 1 12V batteries required. (included) |
| Recommended uses for product | Construction |
| Reusability | Rechargeable |
| Unit Count | 1 Count |
| Unit count | 1 Count |
| Voltage | 12 Volts |

## Product Details

- **Battery capacity:** 7 Amp Hours
- **Battery cell composition:** Lead-Acid, AGM
- **Brand:** LONG
- **Number of batteries:** 1 12V batteries required. (included)
- **Recommended uses for product:** Construction

## Images

![Long Lead Acid Agm Battery (7 Ah/12 Volt) - Image 1](https://m.media-amazon.com/images/I/61+EUJS8m1L.jpg)

## Customer Reviews

### ⭐⭐⭐⭐⭐ جودة ممتازة
*by ا***ة on 26 September 2025*

بطارية ممتازة لم اواجه مشاكل وتعمل بكفائه

### ⭐ مش حالك
*by D***A on 2 August 2025*

مش حالك

### ⭐⭐⭐⭐⭐ تعمل بشكل ممتاز
*by A***A on 10 May 2025*

منتج ممتاز من شركة ممتازة

## Frequently Bought Together

- Long Lead Acid Agm Battery (7 Ah/12 Volt)
- Clorox Liquid Bleach Original 3.78Litre
- COMFORT Fabric Softener, Flora Soft, with freshness-burst technology for longer lasting fragrance & soft clothes, 3L

---

## Why Shop on Desertcart?

- 🛒 **Trusted by 1.3+ Million Shoppers** — Serving international shoppers since 2016
- 🌍 **Shop Globally** — Access 737+ million products across 21 categories
- 💰 **No Hidden Fees** — All customs, duties, and taxes included in the price
- 🔄 **15-Day Free Returns** — Hassle-free returns (30 days for PRO members)
- 🔒 **Secure Payments** — Trusted payment options with buyer protection
- ⭐ **TrustPilot Rated 4.5/5** — Based on 8,000+ happy customer reviews

**Shop now:** [https://www.desertcart.gr/products/255998277-long-lead-acid-agm-battery-7-ah-12-volt](https://www.desertcart.gr/products/255998277-long-lead-acid-agm-battery-7-ah-12-volt)

---

*Product available on Desertcart Greece*
*Store origin: GR*
*Last updated: 2026-07-22*